Petronas Carigali, Malaysia

From a pilot project to a successful solution

The leader of the Malaysian oil and gas industry launched a pilot project by installing the Multiphase Pump Technology at one of their fields.

The system was set up and successfully commissioned at Tembungo-B, an unmanned offshore satellite platform in Sabah Waters in August 2007.

The Tembungo oil fields consists on an integrated production and processing platform, the Tembungo-A and Tembungo-B. The unprocessed mixture of gas and crude from Tembungo-A is routed by a 6 inches trunk line departing to Tembungo-B.

In order to guarantee the customer the highest degree of security Bornemann installed an on skid control system.

Technical data:

Size of equipment:    1 MPC 208            
Uptime: 99 %
GVF: up to 100 %
Volume of mix:140 m³/h
∆ pressure:21 bar
Installed power:240 kW 